This checklist identifies Key Commissioning Test Requirements and Key Preparations and Cautions for the terminal equipment associated with an air handler. When writing a test, use this checklist to help ensure that these key areas have been covered. The buttons following the checklist items link to supporting information within the Functional Testing Guide and the Control System Design Guide.

Link Legend:

Test Guidance Test
Guidance
Tips Tips Typical Problems Typical
Problems
Design Issues Design
Issues
Control System Design Guide Control System
Design Guide

Key Commissioning Test Requirements

Key Component Test Requirements

Component-level functionality can be verified through spot-checking randomly selected units.Test Guidance

Key System Test Requirements:

System-level testing verifies that terminal units respond according to the sequence of operations. These tests are performed primarily by changing setpoints and observing response in the control system.Test Guidance

Key Preparations and Cautions