This checklist identifies Key Commissioning Test Requirements and Key Preparations and Cautions for testing the integrated operation and control of a building's HVAC systems. When writing a test, use this checklist to help ensure that these key areas have been covered. The buttons following the checklist items link to supporting information within the Functional Testing Guide and the Control System Design Guide.

Link Legend:

Test Guidance Test
Guidance
Tips Tips Typical Problems Typical
Problems
Design Issues Design
Issues
Control System Design Guide Control System
Design Guide

Key Commissioning Test Requirements

Integration testing will be unique to each building, so key requirements will also be unique. The process for integration, however, can be generalized to start at the component level, and proceed to the subsystem, system, and building level. Refer to the Air Handler Module, Chiller Module, Boiler Module, and Pumping Module for individual component/subassembly and system acceptance criteria.Tips

Key Preparations and Cautions

Page last updated: September 11, 2006