This checklist identifies Key Commissioning Test Requirements and Key Preparations and Cautions for testing constant flow pumping systems. When writing a test, use this checklist to help ensure that these key areas have been covered. The buttons following the checklist items link to supporting information within the Functional Testing Guide and the Control System Design Guide.

Link Legend:

Test Guidance Test
Guidance
Tips Tips Typical Problems Typical
Problems
Design Issues Design
Issues
Control System Design Guide Control System
Design Guide

Key Commissioning Test Requirements

A pump performance test has been conducted to achieve the following objectives (this test should be performed if the pump appears oversized based on the TAB report and physical inspections):Test Guidance

The control sequences have been tested to achieve the following objectives: